Data center signed-not-commenced backlog measures contractual rent associated with leases that have been signed but have not yet begun generating in-place lease revenue.
Digital Realty reports backlog as annualized GAAP base rent from leases signed but not yet commenced, based on the estimated future commencement date at signing.
Backlog bridges bookings and the in-place rent base
Digital Realty reported $1.0 billion of signed-not-commenced backlog at its share at the end of the first quarter of 2026 and $1.4 billion at its share at the end of the second quarter.
The commercial sequence is:
lease signed → backlog → lease commences → in-place rent
That makes backlog a forward contracted-revenue indicator.
It is not current-period revenue.
Commencement timing matters
Large data-center leases can require months of construction, power delivery, customer installation, and commissioning before rent begins.
Digital Realty therefore discloses expected backlog commencement timing.
A growing backlog can support future revenue visibility while contributing little to current revenue if commencement dates are far away.
Backlog is not Equinix Annualized Gross Bookings
Data Center Annualized Gross Bookings at Equinix only include qualifying contracts expected to begin generating revenue within 90 days.
Digital Realty's signed-not-commenced backlog can include much longer commencement lags.
The measures are therefore useful for different questions and should not be compared as if they shared one definition.
Backlog can change without new leasing
Digital Realty's historical backlog can be adjusted for:
- lease commencements;
- acquisitions or asset purchases;
- dispositions;
- joint-venture contributions;
- ownership changes; and
- other reconciling items.
A quarter-over-quarter backlog change is not automatically equal to new bookings minus commenced leases.
Primary-source examples
- Digital Realty fourth-quarter 2025 financial results
- Digital Realty first-quarter 2026 financial results
- Digital Realty second-quarter 2026 financial results
- Digital Realty second-quarter 2026 results
Data center signed-not-commenced backlog is most useful as a contracted future-rent pipeline whose commencement timing and ownership basis must be preserved.
Part of the Data Center Operating Model
See It in Company Research
These companies are examples of how the concept is reported or discussed in public filings. Definitions can differ by issuer; these links open company research rather than a normalized metric comparison.
Continue Research
Continue from the concept into the Grizzly Bulls research surface that best matches the next question. These links are research continuations, not recommendations or required steps.
Compare data-center operators
Continue into stock comparison for recurring revenue, utilization, leasing demand, backlog, interconnection exposure, capital intensity, growth, and valuation context.
Explore more topics in the Financial Research Encyclopedia.