Data center capacity under construction measures the megawatts of data-center capacity currently in active development under the issuer's stated project scope.
It is a near-term development-supply measure, not in-place leased capacity.
Megawatts under construction show supply that is moving toward service
Digital Realty reported 1,169 megawatts of projects underway as of March 31, 2026.
That figure gives investors a physical view of capacity being built before it becomes stabilized operating inventory.
The number is especially useful when read with Data Center Pre-Leased Development Percentage, because the same amount of construction can carry very different lease-up risk depending on how much is already committed.
Construction capacity is not the same as available capacity
Projects under construction may still require power delivery, building completion, customer fit-out, commissioning, and lease commencement.
A megawatt in an active project should therefore not be treated as immediately revenue-producing capacity.
Scope matters
Digital Realty reports capacity under construction across consolidated and unconsolidated development projects under its stated methodology.
Other operators may report cabinets, critical load, gross building power, or phased campus capacity instead of directly comparable megawatts.
Primary-source examples
- Digital Realty first-quarter 2026 Form 10-Q
- Digital Realty first-quarter 2026 results
- Digital Realty first-quarter 2026 supplemental results
Data center capacity under construction is most useful as a near-term physical development pipeline measure. Pair it with pre-leasing, stabilized yield, future development capacity, and signed-not-commenced backlog.
Part of the Data Center Operating Model
See It in Company Research
These companies are examples of how the concept is reported or discussed in public filings. Definitions can differ by issuer; these links open company research rather than a normalized metric comparison.
Continue Research
Continue from the concept into the Grizzly Bulls research surface that best matches the next question. These links are research continuations, not recommendations or required steps.
Compare data-center operators
Continue into stock comparison for development capacity, pre-leasing, backlog, rent, utilization, interconnection, capital intensity, and valuation context.
Explore more topics in the Financial Research Encyclopedia.