Rail equipment 12-month backlog growth measures year-over-year growth in the subset of Wabtec's backlog designated as 12-month backlog.
Wabtec reported $9.140B of 12-month backlog at June 30, 2026, up 11.3% from $8.210B a year earlier.
The measure is a subset of total backlog
Wabtec explicitly identifies 12-month backlog as part of the larger multi-year backlog.
That makes it a nearer-term visibility measure rather than a separate order book.
Near-term and total growth can diverge
Total backlog grew 41.7% in the same comparison, much faster than 12-month backlog.
Read it with total backlog growth and Transit sales growth.
Primary source: Wabtec Q2 2026 earnings release filed with the SEC.
Part of the Rail Equipment Manufacturing Economics
See It in Company Research
These companies are examples of how the concept is reported or discussed in public filings. Definitions can differ by issuer; these links open company research rather than a normalized metric comparison.
- WABOpen operating-model research →7 of 7 reviewed concepts in Rail Equipment Manufacturing EconomicsBacklog visibility and cash conversion3 of 3 bridge concepts supportedContinue through this bridge:Operating Cash Flow ConversionTotal Backlog Growth
Continue Research
Continue from the concept into the Grizzly Bulls research surface that best matches the next question. These links are research continuations, not recommendations or required steps.
Compare rail equipment economics
Compare near-term backlog growth as a subset of Wabtec's total multi-year backlog.
Explore more topics in the Financial Research Encyclopedia.